§ 58-511. General standards.  


Latest version.
  • In all special flood hazard areas the following provisions are required:

    (1)

    All new construction and substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse, and lateral movement of the structure.

    (2)

    All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.

    (3)

    All new construction and substantial improvements shall be constructed by methods and practices that minimize flood damages.

    (4)

    Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding to the regulatory flood protection elevation. These include, but are not limited to, HVAC equipment, water softener units, bath/kitchen fixtures, ductwork, electric/gas meter panels/boxes, utility/cable boxes, hot water heaters, and electric outlets/switches.

    (5)

    All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system.

    (6)

    New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters.

    (7)

    On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding.

    (8)

    Any alteration, repair, reconstruction, or improvements to a structure, which is in compliance with the provisions of this article, shall meet the requirements of "new construction" as contained in this article.

    (9)

    Nothing in this article shall prevent the repair, reconstruction, or replacement of a building or structure existing on the effective date of the ordinance from which this article derived and located totally or partially within the floodway, nonencroachment area, or stream setback, provided there is no additional encroachment below the regulatory flood protection elevation in the floodway, nonencroachment area, or stream setback, and provided that such repair, reconstruction, or replacement meets all of the other requirements of this article.

    (10)

    New solid waste disposal facilities and sites, hazardous waste management facilities, salvage yards, and chemical storage facilities shall not be permitted.

    (11)

    All subdivision proposals and other development proposals shall be consistent with the need to minimize flood damage.

    (12)

    All subdivision proposals and other development proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage.

    (13)

    All subdivision proposals and other development proposals shall have adequate drainage provided to reduce exposure to flood hazards.

    (14)

    All subdivision proposals and other development proposals shall have received all necessary permits from those governmental agencies for which approval is required by federal or state law, including Section 404 of the Federal Water Pollution Control Act Amendments of 1972; 33 U.S.C. 1334.

    (15)

    When a structure is partially located in a special flood hazard area, the entire structure shall meet the requirements for new construction and substantial improvements.

    (16)

    When a structure is located in multiple flood hazard zones or in a flood hazard risk zone with multiple base flood elevations, the provisions for the more restrictive flood hazard risk zone and the highest base flood elevation (BFE) shall apply.

(Ord. No. O-2008-10, 10-13-2008)