§ 58-271. Conditional zoning district amendment procedure.  


Latest version.
  • (a)

    Traffic impact analysis. The applicant shall be required to meet the requirements described in both the Traffic Impact Analysis Process and Procedures Manual, and Appendix C: Traffic Impact Analysis.

    (b)

    Application.

    (1)

    Petitioning for a conditional zoning district and can be initiated only by the owner of the property or by his authorized agent or the Town of Weddington. All applications must include a site plan, drawn to scale, and supporting text, all of which will, if approved, become a part of the amendment. The site plan, drawn by an architect, landscape architect, or engineer licensed to practice in the state, shall include any supporting information and text that specifies the actual use or uses intended for the property and any rules, regulations and conditions that, in addition to all predetermined requirements of this chapter, will govern the development and use of the property. The applicant shall, at a minimum, include as part of the application each of the items listed below:

    a.

    A boundary survey showing the total acreage, present zoning classifications, date and north arrow.

    b.

    The names, addresses and the tax parcel numbers of the owners of all adjoining properties.

    c.

    All existing easements, reservations, and rights-of-way on the property to be rezoned.

    d.

    Proposed principal uses. For residential uses this shall include the number of units and an outline of the areas where the structures will be located. For nonresidential uses, designation of the areas within the development where particular types of uses will occur, with reference made to the list of uses found in subsection 58-60(1).

    e.

    Lot sizes for residential and nonresidential uses and proposed outparcels, as applicable.

    f.

    Detailed information on the number, height, size and location of structures.

    g.

    All proposed setbacks, buffers, screening and landscaping required by this chapter or otherwise proposed by the applicant.

    h.

    All existing and proposed points of access to public streets from the development.

    i.

    A detailed description of all proposed phasing of development for the project.

    j.

    Number, location, type and size of all signs proposed to be erected by the developer at entrances to the site. Additionally, a general description of other proposed signs including number, location, type and size of all commercial signs. Actual approval of signs shall be a part of the design review provided for in subsection (h)(8) of this section.

    k.

    Exterior treatments of all principal structures including proposed materials and general architectural design.

    l.

    Delineation of areas within the regulatory floodplain as shown on official flood hazard boundary maps for county.

    m.

    Existing and proposed topography at five-foot contour intervals or less.

    n.

    Scale and physical relationship of buildings relative to abutting properties. This may be accomplished by providing existing and proposed topographic elevation cross-sections of the site showing proposed structures relative to existing adjacent properties.

    o.

    Lighting plan and proof of conformity to the article IV of chapter 14.

    (2)

    Said site plan, including all additional information shown on it, shall constitute part of the application for rezoning to a conditional zoning district. The zoning administrator, on a case-by-case basis and at his sole discretion, may specify how many copies of the application the applicant must submit in order to have enough copies for review. No application shall be deemed complete unless accompanied by a fee in accordance with the most recently adopted fee schedule adopted by the town council. Furthermore, the applicant acknowledges that he/she will reimburse the town for all engineering and consulting services associated with the review of the conditional zoning request prior to any zoning permits being issued by the town for such project.

    (3)

    It is further acknowledged that the town reserves the right to approve a rezoning to a B-1(CD), B-2(CD) or MX conditional district simultaneously with the approval of a sketch plan for a major subdivision, providing that all applicable provisions of this section and article II, chapter 46 are followed. Furthermore, an application to rezone property to a conditional zoning district will also require the applicant to submit all construction plans for infrastructure improvements, individual buildings, and signs as provided in subsection (h)(8) of this section.

    (c)

    Additional requirements. When reviewing an application to rezone property to a conditional zoning district, the planning board and/or town council may request additional information in addition to that required in subsection (a) of this section, as they deem necessary.

    (d)

    Public involvement meeting. Once the requisite copies of the application have been submitted to the town and the requisite fees have been paid, a public involvement meeting (PIM) shall be scheduled and held. Such meetings shall occur prior to any recommendation by the planning staff and approval by the town council. The PIM is designed to provide an opportunity for community involvement in accordance with the following requirements:

    (1)

    The applicant shall provide an agenda, schedule, location and list of participants such as landscape architects, engineers, etc., to answer questions from citizens and service providers for the project in cooperation with the planning staff.

    (2)

    The PIM shall be a minimum of four hours. Two hours shall be scheduled during normal business hours to allow service providers (such as the state department of transportation, utilities, or the state department of environment and natural resources) to participate as needed and to allow citizens to appear at a convenient time throughout the period. It is strongly recommended that this portion of the PIM take place at the proposed development site. In addition, a two-hour evening period shall be scheduled at the Town Hall or other nearby location agreed upon by the applicant and planning staff.

    (3)

    Notice of public involvement meetings shall, at a minimum, be given as follows:

    a.

    A public notice shall be sent by the town to a newspaper having general circulation in the town not less than ten days or more than 25 days prior to the date of the PIM.

    b.

    A notice shall be sent by first class mail by the town to the owners of all properties that lie within 1,300 feet of the exterior boundaries of the proposed development. The applicant shall furnish the town with mailing labels that depict the names and addresses of all such owners. Such notice shall be mailed to said property owners not less than ten days prior to the date of the PIM. The notification shall contain information regarding the PIM time and location, as well as a general description of the proposal.

    c.

    A PIM notification sign shall be posted by the town in a conspicuous place at the property not less than ten days prior to the PIM. The sign shall indicate the date, time and location of the PIM.

    d.

    The applicant shall reimburse the town for all expenses incurred to provide the notifications required by this subsection.

    (4)

    Town staff will keep notes of citizen comments received during the PIM. In addition, all service provider comments shall be recorded by the town, including, but not limited to, all correspondence, reports and oral comments by service providers. After town review, this information will be available at the Town Hall and at subsequent meetings concerning the project. When practical, comments, ideas and suggestions presented during the PIM should be incorporated by the developer into the proposed development.

    (5)

    Following the PIM, the applicant shall have the opportunity to make changes to the application to take into account information and comments received. One or more revised copies of the application shall be submitted to the zoning administrator for review. No additional fee shall be required to be paid for making such changes provided the zoning administrator receives the revised application within 30 days following the PIM. If a revised application is not received during said 30-day period, or if the applicant otherwise notifies the zoning administrator in writing that no revised application will be submitted, the zoning administrator shall review the original application.

    (e)

    Zoning administrator approval. The zoning administrator shall have up to 30 days following any revision of the application (or up to 60 days following the PIM, if no revision is submitted) to make comments. If the administrator forwards no comments to the applicant by the end of said period, the application shall be submitted to the planning board for their review without any further comment. If the zoning administrator provides the applicant with comments on the application, the applicant shall have ten days after receiving the comments to inform the zoning administrator whether the application will be further revised. If the applicant informs the zoning administrator that the application will not be further revised, the zoning administrator shall submit the application to the planning board for their review at the next regularly scheduled meeting. If the applicant informs the zoning administrator that the application will be further revised, the zoning administrator shall not submit the current application to the planning board. Once the applicant submits a revised application, it shall be subject to review in accordance with this section.

    (f)

    Planning board review. The applicant shall submit at least ten copies of the application to the zoning administrator for transmittal to the planning board and other appropriate agencies. The zoning administrator shall present any properly completed application to the planning board at its next regularly scheduled meeting occurring at least 15 days after the application has been deemed complete and ready for submission to the planning board in accordance with subsection 58-271(d)(4) of this section. The planning board may, by majority vote, shorten or waive the 15-day time period provided in this section for receipt of a completed application. The planning board shall have 30 days from the date that the application is presented to it to review the application and to take action. If such period expires without action taken by the planning board, the application shall then be transferred to the town council without a planning board recommendation.

    (1)

    A planning board member shall not vote on any conditional zoning amendment where the outcome of the matter being considered is reasonably likely to have a direct, substantial, and readily identifiable financial impact on the member.

    (2)

    Upon making a recommendation, the planning board shall advise and comment on whether the proposed amendment is consistent with any comprehensive plan that has been adopted and with any other officially adopted plan that is applicable. The planning board shall provide a written recommendation to the town council that addresses plan consistency and other matters as deemed appropriate by the planning board, but a comment by the planning board that a proposed amendment is inconsistent with the comprehensive plan shall not preclude consideration or approval of the proposed amendment by the town council.

    (g)

    Action by town council. Conditional zoning district decisions are a legislative process subject to judicial review using the same procedures and standards of review as apply to general use district zoning decisions. Conditional zoning district decisions shall take into account applicable adopted land use plans for the area and other adopted land use policy documents and/or ordinances. Prior to making a decision on rezoning a piece of property to a conditional zoning district, the town council shall hold a public hearing. Notice of such public hearing shall be given as prescribed in subsection 58-270(g).

    (1)

    A statement analyzing the reasonableness of the proposed rezoning shall be prepared for each application for a rezoning to a conditional district.

    (2)

    Once the public hearing has been held, the town council shall take action on the application. The town council shall have the authority to:

    a.

    Approve the application as submitted;

    b.

    Deny approval of the application;

    c.

    Approve the application with modifications that are agreed to by the applicant; or

    d.

    Submit the application to the planning board for further study. The application may be resubmitted to the planning board with any modifications that are agreed to by the applicant. The planning board shall have up to 30 days from the date of such submission to make a report to the town council. Once the planning board issues its report, or if no report is issued within that time period, the town council can take action on the application in accordance with this subsection.

    (3)

    In the town council's sole discretion, it may hold additional public hearings on an application at any time before it takes a final vote to approve or deny that application.

    (4)

    A town council member shall not vote on any conditional zoning amendment where the outcome of the matter being considered is reasonably likely to have a direct, substantial and readily identifiable financial impact on the member.

    (h)

    Conditions to approval of application. In approving an application for the reclassification of a piece of property to a conditional zoning district, the planning board may recommend, and the town council may request that reasonable and appropriate conditions be attached to approval of the application. Any such conditions may relate to the relationship of the proposed use to the surrounding property, to proposed support facilities (e.g., parking areas, pedestrian circulation systems), to screening and landscaping, to the timing of development, to street and right-of-way improvements, to water and sewer improvements, to provision of open space, or to any other matters that the planning board or town council may find appropriate or the applicant may propose. Such conditions to approval may include dedication of right-of-way or easements for streets and/or utilities to serve the development. The applicant shall have a reasonable opportunity to consider and respond to any such proposed conditions prior to final action by the town council.

    (i)

    Review of plans and construction documents.

    (1)

    If the town council approves the application, the applicant's plans and construction documents will be subject to review in accordance with this section.

    (2)

    Where the DRB exists when the applicant submits any plans for review under this section, the DRB will review the plans in accordance with the following procedures. If no DRB exists when the applicant submits a set of plans for review, the functions of the DRB will be performed by the town planning board.

    a.

    Review of building schematics, landscape plans and signs.

    1.

    The applicant shall submit to the planning staff for review and comment detailed plans and schematic designs for all buildings on the site, landscaping on the site and signs on the site. The planning staff may provide such submitted plans to town consultants or to other third parties to assist the town's review. The applicant shall reimburse the town for all costs and expenses that the town incurs in reviewing plans under this section.

    2.

    The applicant need not submit plans for all buildings, landscaping and signs simultaneously, and may instead submit multiple sets of plans, each of which shall be separately and independently reviewed. Notwithstanding this provision, the DRB or the town council need not review plans submitted to it if, in its sole discretion, it determines that it cannot effectively review those plans without simultaneously reviewing plans for other buildings, landscaping and/or signs.

    3.

    If the zoning administrator determines that a set of plans submitted by the applicant is complete and contains all information necessary to determine if those plans satisfy the standards specified in this subsection, the zoning administrator shall forward those plans to the DRB.

    4.

    The DRB shall have 60 days from the date a set of plans is submitted to it to recommend to the town council whether it should approve those plans. The DRB's recommendation will be based solely upon its determination of whether the plans and schematic designs satisfy the standards specified in this section and meet the requirements of the town's architectural design standards (see chapter 14, article V). If the DRB recommends that any plans not be approved, it shall state the reasons for that recommendation in writing and shall inform the applicant that it may withdraw those plans.

    5.

    A set of plans shall be submitted to the town council at its next regularly scheduled meeting that occurs at least 15 days after the DRB issues its recommendation on those plans. The applicant may withdraw any plans before they are submitted to the council, and the council will not review any plans that are withdrawn. If the DRB makes no recommendation to the council within 60 days after a set of plans are submitted to it, the plans shall be submitted to the town council for review without a DRB recommendation.

    6.

    The town will approve any plans submitted to it unless those plans either violate any requirements of this chapter, including any requirements applicable to the particular conditional zoning district at issue, violate any requirements, standards or conditions contained in the applicant's rezoning application, violate any requirements, standards, or conditions that are imposed under subsection (g) of this section, or will cause the development not to be in harmony with its surrounding area (collectively, the provisions of this subsection constitute the standards referenced in this section).

    7.

    After reviewing plans submitted to it, the town council shall have the authority to:

    i.

    Approve the plans;

    ii.

    Deny approval of the plans;

    iii.

    Approve the plans with any modifications that are agreed to by the applicant; or

    iv.

    Submit the plans to the DRB for further study. The plans may be resubmitted to the DRB with any modifications that are agreed to by the town council and the applicant. The DRB shall have 30 days from the date plans are resubmitted to it to make another recommendation to the town council on whether those plans should be approved. If the DRB makes no recommendation to the council within that time frame, the plans shall be resubmitted to the town council for its review.

    8.

    No building may be constructed unless plans for that building have been approved by the town council in accordance with the process described in this subsection. No landscaping may begin unless plans for that landscaping have been approved by the town council in accordance with the above process. No signs may be erected unless the plans for those signs have been approved by the town council in accordance with the process described in this subsection.

    b.

    Review of other construction documents.

    1.

    Other than schematic designs and plans for buildings, landscaping and signs, all other plans, designs and other documents concerning any other construction or development activities will be reviewed in accordance with this subsection. Documents subject to review under this subsection will be referred to generically as construction documents. Construction documents include, by example only and without limitation, plans for all road improvements, stormwater detention, preconstruction and postconstruction best management practices and grading, soil and erosion control.

    2.

    The applicant shall submit all construction documents to the town's zoning administrator for review. The applicant shall reimburse the town for all costs and expenses the town incurs in reviewing construction documents. The zoning administrator will approve all construction documents unless they violate the standards of this section. No construction or development contemplated by any construction document may be begun unless and until the zoning administrator has approved that construction document in accordance with this subsection.

    c.

    Post approval review. After any and all plans and construction documents for an improvement have been approved, the town staff or other town representatives will periodically inspect that improvement during the construction process and may halt any construction or development that violates the standards. Following completion of the project, the applicant shall request a final inspection. If all improvements and all other development satisfies the standards, the town will issue a certificate of zoning compliance.

    (j)

    Changes to an approved conditional zoning district.

    (1)

    Except as provided in this section, a request to change the site plan or the conditions governing an approved conditional zoning district shall be processed in accordance with this section as a new application to rezone property to a conditional zoning district.

    (2)

    The zoning administrator shall have the delegated authority to approve an administrative amendment to an approved conditional zoning district site plan or to the governing conditions without the requested change having to be approved as a new application in accordance with this section. Such administrative amendments shall include only those changes that do not significantly alter the site plan or its conditions and do not significantly impact abutting properties.

    (3)

    No administrative amendment may increase the amount of allowed nonresidential development by more than ten percent of the approved square footage or 1,000 square feet, whichever is less. No administrative amendment may increase the amount of residential development by more than ten percent of the approved square footage, if a maximum square footage for residential development was imposed, or may increase the maximum number of allowed dwelling units by more than five.

    (4)

    Any request for an administrative amendment shall be in writing, signed by the property owner, and it shall detail the requested change. The applicant must provide any additional information requested by the zoning administrator. Accompanying the written request must be the applicable fee for administrative review, if any, that is required by the current town fee schedule. Any decision by the zoning administrator to approve or deny a request for an administrative amendment must be in writing and must state the grounds for approval or denial. The zoning administrator shall always have the discretion to decline to exercise the authority delegated by this section because the zoning administrator is uncertain if the requested change would qualify as an administrative amendment or because the zoning administrator determines that a public hearing and town council consideration is appropriate under the circumstances. If the zoning administrator declines to exercise the authority delegated by this section, the applicant can only apply for a rezoning in accordance with this section.

    (k)

    Statement of readiness. The petitioner shall submit a statement indicating readiness to proceed with the proposed development by filing with the town council no later than ten days of the approval of the conditional zoning district, a statement signed by the owner or owners of the proposed development that the actual construction shall begin within one year from the date the conditional zoning district was approved, and that the construction shall be completed within 18 months from the approval of the conditional zoning district. In the event the planning board and the town council find that the intent of this section has not been met or that construction has not begun and has not been completed within 18 months, the town may initiate the rezoning of the property in accordance with article IX of this chapter. Notwithstanding the above, nothing shall prohibit a reasonable extension of the 18-month limit by the town council.

(Ord. No. O-2006-20, § 12.2, 11-13-2006; Ord. No. O-2009-08, 7-13-2009; Ord. No. O-2010-09, 6-14-2010; Ord. No. O-2014-21, 12-8-2014; Ord. No. O-2015-09, 6-8-2015)